Timeline
Drop a GPX, get your race-strategy sheet. It fills distance, ascent and descent; you complete speed, stops and sleep.
- ~75 km legsEach leg ends in a town, so you plan around places, not numbers.
- Climbs ≥ 400 mEvery climb and descent over 400 m is its own leg, foot to top, so climb pace stays separate from the flat.
- FerriesCrossings become their own leg too.
Legs land near towns, around this length. Climbs and descents over 400 m stay their own legs. Takes about 30 s, longer for a whole race.
Working
Rename any point in the table first (a pass, a checkpoint), the sheet uses your names. Then fill speed, stops, sleep and your start time in Excel or Google Sheets. The rest calculates.
| # | Location | km | Ascent | Descent | Type | Resupply in this leg |
|---|
Same file